Monday, July 18, 2011

Kitchen Install

Just a few shots of the kitchen as it was being installed.  There's still clean up to do (sawdust!!) and some touch up work.  The finishing nails in the molding need to some putty and paint and then we can put the doors back on. They just click into place, so it won't take much time at all. 

It's also hard to use our kitchen just yet, since there won't be a functional sink until we have our countertops in place.

But...I'm am LOVING how it turned out! I'll keep you posted as things continue to happen.


Toe kick register needs to be painted black. Cabinet next to the window is lighted with a glass front. Range & hood will be placed on this wall.

Dishwaser will be to the right of the sink.  Microwave goes in the bottom of the corner unit with flip up shelves. Two floating shelves will be installed next to corner unit.


Pantry wall with lots of storage! Try to ignore the ugly old fridge!

Full extension rollout drawers in the pantry.

Coffee bar in dining room.
So there you have it! That's where we're at right now.  Still lots to do to make it a pretty and usable kitchen, but I think we're off to a good start!
See the kitchen progress:
BEFORE
SAMPLES
LAYOUT DRAWINGS
4 comments on "Kitchen Install"
  1. Wow looks like it will be GREAT, cannot wait to see it all finished!! YAY for you guys!!

    ReplyDelete
  2. Beautiful...can wait to see the final product...I'll be there to test it out in sept when the little bambino/a arrives!
    Love you
    Shy

    ReplyDelete
  3. Oh my goodness! This is coming together beautifully! I can't wait to see more!! So excited for you!

    ReplyDelete
  4. Congratulations - it is a gorgeous kitchen!R&R

    ReplyDelete

I love hearing from you!